Saturday, February 03, 2007
Maria starts the Tiling
The long awaited tiles arrived on site to day and Maria wasted no time in making a start, this section had to be tiled first because once the shower false wall and cubicle are erected it will be impossible to tile, to the left of the port hole is where the shower wall will come down to form a straight wall for the shower cubicle and the gap between the boat side and the shower wall will then become storage area for towels.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment